〓东北电力调节技术研究所网站〓
   
 

Current NEPCI projects are concerned with:
Developing turbine control systems;
Developing turbine and boiler coordinating control systems (CCS) for thermal generation;
Creating a self-adaptive control system for steam supply to turbine shaft seals;
Developing computer system for data collecting and controlling.
Automatization process controlling
Developing an intelligent, mechanical actuator for adjusting generator loads;
Developing and installing large hydraulic stations and lubricating oil stations;
Creating high efficiency oil filtering systems;
Designing and manufacturing equipment to refine fire-resistant oil;
Retrofitting and maintaining hydraulic cylinders;
Developing applications of REXA actuators.
Developing electro-hydraulic quick shut valve.

Technical Service
1. Maintaining electro-hydraulic servo valves
2. Adjusting and maintaining hydraulic parts of steam turbines
3. Diagnosing and dealing with DEH system and oil system of steam turbine
4. Maintaining hydraulic cylinders
5. Maintaining all kinds of hydraulic valves and pumps
6. Diagnosing and dealing with all kinds of hydraulic control system